Construction is currently underway at a house at 96 Holworthy St. The house is being built by the Harvest Home/Thrivent Coalition of which Third Presbyterian is a founding member. This construction is the third house the coalition has built since 2015, and the eleventh house Third has helped build since 2009; another Harvest Home/Thrivent house is scheduled for construction in 2020.